A
made to measure service supported by a free advisory service for
users of Rivets, Fasteners and special components for the Motor,
Commercial Vehicle, Defence, Marine, Electronics, Furniture and
all allied trades.
Size
Range
Nominal shank diameters
from 2 to 20.00mm Head or Shoulder diameters up to 45 mm
lengths up to 127 mm.lengths up to 127mm.
Heat
Treatments & Finishes
To customers requirements.
EU
End of Vehicle Life Directive 2000/53/CE
We
actively try to encourage both Automotive and Non-Automotive
customers to use coatings which exclude reportable
substances which will soonor have become banned (eg. Chrome
6).
It is Bartons view that
a directive (or directives) similar to the above will soon come
into force which will cover such items as white goods and many other
products used in everyday life.
Examples
of coatings to be avoided are:
•
Almac (Zinc-Aluminium). Colour - Pale Yellow.
• Chromium
(Hard). Colour - Metallic Silver.
• Dacromet
500 LC. Colour - Silver Grey (Spec eg. Ford
S301, Rover RES 2.ZS.05).
• Dacromet
320. Colour - Silver Grey.
• Dacromet
& Black. Colour - Black.
• Dorreltech
Top coat for Deltatone. Colour - Silver Grey (Spec
eg.Ford S426).
• Dorreltech
Top coat for Zinc Plate. Colour - Cream/Silver.
• Inverplex
(Tin-Zinc). Colour - Pale Yellow.
• Sermagard.
Colour - Silver (Spec eg. Ford S431, GM 6164M).
• Zinc Mechanical
Chromated. Colour - Yellow/Brown (Spec eg.
Ford S309M).
• Zinc Electroplate
Clear Chromate (Hexavalant). Colour - Metallic Silver.
• Zinc Electroplate
Chromated Yellow iridescent. Colour - Yellow (Spec
eg.Ford S309, Rover RES 22.ZS.01).
• Zinc Electroplate
Olive Drab. Colour - Olive/Brown.
• Zinc Electroplate
Black Chromate. Colour - Black.
• Zinc Electroplate
Leach & Seal. Colour - Metallic Silver.
• Zinc Nickel
Chromated. Colour - Yellow/Brown.
• Zinc Iron
Black. Colour - Black.
Materials
Steel and alloy steel. Aluminium and its alloys. Brass,
copper and stainless-steel
(All to national and international
standards)
Quantity
Generally, quanities start from around 50,000 and run into the multi-millions
Packing - to customers requirements
Delivery
Delivery time from placement of
order can take place within weeks depending
on part complexity. Follow on orders can be as short as several
days depending on machine and process availability. Buffer stocks
can also be arranged. |